Chilled Water Loop Differential Pressure Reset
Understand how the chilled water loop differential pressure reset works. Explore the sequence of operation (SOO) logic, potential interaction with other SOOs, and additional resources.
Overview
On milder days during the cooling season, the flow of chilled water (CHW) to the air handling units (AHUs) can be reduced (i.e., reset) based on the differential pressure across the loop. The differential pressure is measured at pump outlet and the farthest point from the pump in the CHW loop system, and it is a function of the average cooling coil valve positions at the AHUs. Differential pressure (DP) reset saves energy by optimizing central cooling plant energy consumption and by minimizing AHU reheat calls.
The goal of DP reset is to use less chilled water plant energy during periods of lower cooling demand. This is accomplished by decreasing the pump speed to match the DP setpoint across the supply coils and control valve(s). By adjusting the system pump speed as demand changes, the load on the chilled water pumps is decreased, as is the load on the chiller system. Without this SOO, the pumps would continually run at high speed while most of the chilled water is pumped through the bypass valve in the system, leading to wasted energy.
Basic Control Logic
Sequences of operation (SOOs) are feedback loops that employ a combination of sensors, controllers, and actuators to impact a process and maintain a desired state. For example, a thermostat provides a signal to a controller, and the controller sends a signal to the furnace. When the temperature falls below a certain setpoint, the controller sends a signal to the furnace to fire up and to turn on the air handler to provide heated air to the conditioned space. Once the temperature reaches the desired setpoint, the controller sends a signal to reduce the fan speed and/or to turn off the furnace.
Figure 1 presents a schematic of the general principle of the differential pressure (DP) reset control feedback loop. If the outdoor air temperature (OAT) is moderate, and by proxy the cooling load is not at peak condition, then the building automation system (BAS) will start to close cooling coil valves to maintain the desired supply air temperature. As the cooling coil valves close, the flow to the coils is reduced and the differential pressure increases across the CHW loop. This increase in pressure is then sent to the BAS as a measured error signal, which in turn lowers the pump speed to maintain the DP setpoint.

Algorithm for the Sequence of Operation
The general differential pressure (DP) reset algorithm is described in the 2019 ASHRAE Handbook, “HVAC Applications.” Implementation of the algorithm generally involves checking the DP in the chilled water loop and adjusting the DP as needed. The type of adjustment made depends on the control curve implemented in the BAS. The general control loop for a DP reset is to check the current cooling coil valve position and supply air temperatures (SAT) on the AHUs. If more than one control valve is found to be fully open and SAT are satisfied, then the DP setpoint can be decreased, which lowers the pump speed. If none of the valves are fully open and the AHU SAT are satisfied, the DP setpoint can also be lowered. The DP setpoint lower limit is constrained by the minimum flow need for the entire chilled water system. This process is repeated across a fixed time interval and allows for the DP setpoint to be dynamically reset as the cooling load changes.
Interaction with other SOOs
The supply air temperature reset SOO has potential interactivity with the other SOOs listed below. Cumulatively, these may also interact with the overall water- or air-cooled chilled water plant.
Chilled Water Supply Temperature Reset – Since DP reset slows down the chilled water flow, and therefore also the heat transfer rate to the AHUs, it must be coordinated with the chilled water supply temperature (CHWST) reset algorithm. If the CHWST setpoint is raised and the flow is lowered simultaneously, insufficient heat is removed from the building. Taylor (2012) explains that, for primary variable and secondary variable chilled water loops, the two SOOs should be sequenced, as follows: CHWST setpoint should first be raised to lower the cooling capacity, and when the CHW setpoint cannot be raised any higher, the differential pressure setpoint should begin to be reduced. If the chilled water loop has constant speed pumps, then the sequence should be flipped: first increase the differential pressure (to reduce flow), then modulate the CHWST setpoint by staging the chillers or reducing capacity with vane guides (Taylor, 2012).

Waterside Economizing – A fully integrated waterside economizer (WSE) is not necessarily designed to match the full design CHW flow rate; in general, the flow rate through a fully integrated WSE is lower than the design flow of the chiller and therefore less energy is needed from the CHW pumps when the WSE is operating. When WSE is on and the chiller is off, the differential setpoint may be lower than when the WSE is off, adding to the energy savings. When the WSE and the chiller are on, the system must also maintain a minimum DP setpoint to ensure proper flow through the chiller.
Nighttime Zone Temperature Setbacks – In the event of a nighttime zone temperature setback, the DP SOO would function as normal but with a significantly lower cooling load. In some cases where the temperature setback results in the system being turned off for unoccupied hours, the pressure reset SOO would not be applicable.
How do I…
Assess SOO Energy Usage
The energy savings from DP reset comes from reducing the amount of electrical energy that is needed to pump chilled water through the CHW loop system. The chiller plant should also be evaluated if modifications to the chilled water loop are planned, as there may be interactive effects that need to be considered, or time-of-day considerations (e.g., required flow at startup, if the building operates on a temperature setback).
Quantify Electricity Usage (kWh)
Determine the total amount of electricity used to operate all pump motors in the chilled water loop system.
Equipment to Measure
What to Measure:
- Average hourly electricity usage (kWh) of chilled water pumps.
- Average hourly electricity usage (kWh) of the secondary chilled water pump motors (if present).
- Average hourly outdoor air temperature (°F).
Measurement Locations

Calculation Methodology
The general methodology for calculating the electrical energy consumption of the DP reset SOO is to measure the electrical energy consumed by the CHW loop pump and motors during occupied and unoccupied hours. These values are summed and regressed against OAT to develop a temperature-dependent regression model. Depending on the variability of operations, hourly, daily, or weekly models may be developed to better characterize the SOO. This model is then used with climate normal year data to estimate the typical energy use of the CHW pumps and motors.
Further Reading
ASHRAE. (2019). ASHRAE Handbook Online: HVAC Applications (I-P ed.). ASHRAE. Retrieved from https://www.ashrae.org
ASHRAE. (2019). Standard 90.1-2019: Energy standard for buildings except low-rise residential buildings. ASHRAE.
New York City Department of Buildings. (2020). New York City Energy Conservation Code (NYCECC). Retrieved 2021, from Section C403.3.4: https://up.codes/viewer/new_york_city/nyc-energy-conservation-code-2020/chapter/C4/commercial-energy-efficiency#C403.4.4
Taylor, S. (2012). Optimizing Design & Control of Chilled Water Plants. ASHRAE Journal, 56-74.